South Kiama Drive, Stage 2 

 

  • South Kiama Drive Stage 2 is a 13 lot subdivision.

  • It is currently under construction and due to be completed in June 2018.

By Col Douch 069
By Col Douch 069

IMG_0740
IMG_0740

IMG_0560
IMG_0560

By Col Douch 069
By Col Douch 069

1/10