South Kiama Drive, Stage 1  

  • South Kiama Drive Stage 1 included a 30 lot subdivision.

  • It was constructed from a green field site.

  • This project incorporating riparian zone works which had bio-filtration basins which treated the water before exiting the site.

  • This project also conjoined the RMS road on South Kiama Drive major road widening and overlay of asphalt took place.