top of page

120 Yellow Rock Rd, Tulllimbar

  • 120 Yellow Rock Road was an 18 lot subdivision.

  •  This project needed a sewer main upgrade of 300mm which was under board in soild rock.

  • This was a very technical part of the project due to the depth of the main being 7 metres.

  • This project also encountered major traffic control management planning which Yatcon Civil designed and managed.

bottom of page